This project was due to start during Summer Holidays, therefore the works could take place without imposing on the functioning of the school.
As a trusted Garland installer for Brighton & Hove City Council, Invictus Roofing was contracted with stripping the failing roof covering and supplying and fitting a new Garland felt system in accordance with the strict specifications laid out by the manufacturer, as well as increase the insulation efficiency throughout. New cladding and rainwater goods were also installed so that the water drainage needs of this roof are met to prevent future issues.
System Details
- 30-year Garland build up felt Stressply Self-Adhesive Metal Lined VCL
- Tapered Insulation Scheme
- Garland TorchFlex Ultravent Underlay to area
- Garland TorchFlex Base Sheet to details
- Garland StressPly cap sheet in Red
- Works completed within 6 weeks