case studies /

Archer House, Britland industrial estate

No items found.
Completion Date
June 20, 2020
Location
Eastbourne, UK
Service
Bituminous
Sector
Commercial
Roof Size
260m²

The original Asphalt roof of Archer House was failing and water ingress was being reported in the busy accountancy offices below. It was decided that the roof would benefit from a warm roof felt overlay.

The existing asphalt was prepared suitably and a new VCL layer was applied, before installing new 150mm insulation to upgrade the office buildings thermal efficiency. A Danosa 20 year felt system was then installed to the area and the high parapets encapsulated, before installing an aluminium trim. New PV solar panels were then installed.

System Details

  • 20-Year Warranty
  • Danosa PolyDan 180-60/GP Elast+ membrane system
Images Coming Soon!

Contact the invictus team today

Our team of experts value high-quality solutions, workmanship, and communication, ensuring that every project that we undertake is not only aesthetically pleasing but also provides long-term protection and reliability.

We're proud to have delivered our services to many satisfied clients throughout the South of England, building lasting relationships along the way.